Mount Vernon Hospital, Clinical Trials Building, Middlesex, HA6 2RN
The following specialist products were used to carry out the plastering of this project.
- Protector M/F walls were built up to 5m and tacked using fermacell boards (excellent sound, strength and Fire rating).
- Gyproc F multiboard was used to achieve the required fire rating on existing ceilings.
- Rockfon sonar suspended ceilings were installed.
- Isocrete K-Screed was used as the project required a quick drying strong screed which could be laid on insulation boards at reduced thickness compared with a traditional cement/sand screed. Typically the floor would be ready for permanent floor finish within 3-4 wks compared with 11-12 wks with a standard screed.